RK Mechanical Works
Products
Get a quotation
  1. Home
  2. Services
  3. Material supply

Supply

Boiler components and material supply

Tubes, valves, gauges and spares, sourced to your specification, checked on arrival and delivered with their documents.

Boiler components and material supply

Working principle

How it works

The working process in four steps.

  1. Tell us the item

    Share the part number, size, grade or a sample.

  2. We source and check

    Material is matched against its certificate.

  3. Packed for transit

    Items are tagged and packed against the packing list.

  4. Delivered with papers

    Certificates travel with the goods.

Process flow chart

From order to hand-over

Diamonds are hold points: work stops until the check is signed.

  1. RequirementList or drawing
  2. QuotationRate and delivery
  3. Purchase orderAdvance for bulk ordersHold point
  4. SourcingFrom vetted suppliers
  5. Incoming checkAgainst certificatesHold point
  6. PackingTagged and listed
  7. DispatchTransport and e-way bill
  8. DeliverySigned receiptHold point

3D model

The stockyard, in 3D

Drag to turn it. Labels name the parts we make, fit and test.

Boiler bill of materialsPressure partsTubesHeadersBendsMountingsSafety valvesLevel gaugesStop valvesFittingsFlangesGasketsGrate bars

Bill of materials tree

Boiler bill of materialsPressure partsTubesHeadersBendsMountingsSafety valvesLevel gaugesStop valvesFittingsFlangesGasketsGrate bars

ER diagram

How every record connects

One enquiry links through to its quotation, order, jobs, inspections and dispatch, so nothing gets lost between teams.

1:n1:n1:11:n1:n1:n1:nClientPKidcompanyplant, locationEnquiryPKidFKclientservice, dateQuotationPKidFKenquiryrevision, valueOrderPKidFKquotationPO, 45% advanceInspectionPKidFKitemhold point, resultItemPKidFKjobcode, gradeJobPKidFKorderstage, % doneDispatchPKidFKordervehicle, proofPK: the record itself. FK: the record it belongs to. A fork marks the many side.

Quality assurance plan

What gets checked

A typical plan, agreed with you for each job.

StageCheckMethodRecordRole
Order
Spec agreedPO reviewPurchase orderR
Incoming
Grade, size, quantityCertificate and countIncoming reportH
Packing
Tags and protectionChecklistPacking listW
Dispatch
Documents completeDocument checkDispatch noteR

H: hold point, work stops until signed. W: witnessed. R: record reviewed.

Parts and rates

Parts and indicative rates

Indicative market rates. Your written quotation sets the final price.

Part or serviceSpecificationIndicative rate
Boiler tube, seamless
SA 210 Gr A1₹85 to ₹170 per kg
Boiler safety valve
Spring or dead weight, by size₹9,000 to ₹14,000 per piece
Water level gauge
Tubular to reflex, by pressure₹2,000 to ₹14,000 per piece
ESP collecting electrode
IS 513, 1 to 1.6 mm, G profile₹2,500 to ₹5,900 per piece
ESP discharge electrode
Spiral or multipeak₹1,200 to ₹5,000 per piece
Flanges and fittings
By size and ratingOn quotation
Grate bars and castings
By patternOn quotation

Bulk orders

A 45% advance confirms your order

  1. Purchase orderSend your PO with the 45% advance.
  2. Slot confirmedProduction and the delivery date are fixed.
  3. Balance and dispatchThe balance follows your quotation's terms.

Rates are before GST and freight. Only your written quotation fixes the price.

Documents

What you receive

Documents on a typical job. Statutory approvals depend on the job and are agreed in the quotation.

  • QuotationQuotation
  • Material test certificatesCertificate
  • Packing listList
  • Tax invoiceInvoice
  • E-way billTransport
  • Delivery receiptReceipt

Enquiry

Ask about material supply

Share the work, the plant and your timeline. You will receive a written quotation.