Repair and maintenance

Shutdown maintenance

A planned shutdown runs against the clock. We fix the work list first, bring the crew and tools, report daily and box up on the date you set.

Shutdown maintenance

Working principle

How it works

The working process in four steps.

  1. Plan before the stop

    Scope, spares, crew and permits are ready before the plant stops.

  2. Isolate and open up

    Equipment is made safe, then opened for inspection.

  3. Work the list daily

    Each item is tracked, and new findings are approved the same day.

  4. Box up and restart

    Tests close each item before the plant starts up again.

Process flow chart

From order to hand-over

Diamonds are hold points: work stops until the check is signed.

  1. Scope freezeWork list signedHold point
  2. MobiliseCrew, tools, spares on site
  3. IsolationLock-out and permitsHold point
  4. Open upInspect and record
  5. Execute listDaily progress report
  6. Extra findingsApproved same dayHold point
  7. Box upClose equipment
  8. TestsLeak and run checksHold point
  9. DemobiliseSite cleared, report closed

3D model

The whole plant, in 3D

Drag to turn it. Labels name the parts we make, fit and test.

Scope freezeMobiliseIsolationOpen up and inspectExecute work listExtra findingsBox upTests and restartSample shutdown timeline. Days are set by your window.

Shutdown bar chart

Scope freezeMobiliseIsolationOpen up and inspectExecute work listExtra findingsBox upTests and restartSample shutdown timeline. Days are set by your window.

ER diagram

How every record connects

One enquiry links through to its quotation, order, jobs, inspections and dispatch, so nothing gets lost between teams.

1:n1:n1:11:n1:n1:n1:nClientPKidcompanyplant, locationEnquiryPKidFKclientservice, dateQuotationPKidFKenquiryrevision, valueOrderPKidFKquotationPO, 45% advanceInspectionPKidFKworkitemhold point, resultWorkItemPKidFKjobtag, scopeJobPKidFKorderstage, % doneDispatchPKidFKordervehicle, proofPK: the record itself. FK: the record it belongs to. A fork marks the many side.

Quality assurance plan

What gets checked

A typical plan, agreed with you for each job.

StageCheckMethodRecordRole
Before start
Scope, permits, crew listReadiness reviewReadiness checklistH
Daily
Progress against planSite meetingDaily progress reportR
Each job
Work done to scopeJob card sign-offJob cardW
Box up
Clean and completeJoint inspectionBox-up checklistH
Close-out
All items closedPunch listClose-out reportR

H: hold point, work stops until signed. W: witnessed. R: record reviewed.

Parts and rates

Parts and indicative rates

Indicative market rates. Your written quotation sets the final price.

Part or serviceSpecificationIndicative rate
Annual overhauling
Full off-season scopeOn quotation
Skilled crew
Fitters, welders, riggersOn quotation
Supervision
Engineer on siteOn quotation
Tools and tackles
Per shutdownOn quotation
Boiler tube, seamless
SA 210 Gr A1₹85 to ₹170 per kg

Bulk orders

A 45% advance confirms your order

  1. Purchase orderSend your PO with the 45% advance.
  2. Slot confirmedProduction and the delivery date are fixed.
  3. Balance and dispatchThe balance follows your quotation's terms.

Rates are before GST and freight. Only your written quotation fixes the price.

Documents

What you receive

Documents on a typical job. Statutory approvals depend on the job and are agreed in the quotation.

  • Shutdown work listList
  • Bar chart scheduleSchedule
  • Crew and tool listList
  • Daily progress reportsReport
  • Job cardsRecord
  • Box-up checklistsList
  • Close-out reportReport