Columns, beams, platforms, stairs and supports, built to drawing and erected true, so the equipment they carry sits right the first time.

Working principle
How it works
The working process in four steps.
Loads go down the columns
Beams pass the load of equipment and floors into columns and base plates.
Bracing stops the sway
Diagonal members hold the frame square against wind and vibration.
Connections carry the job
Bolted and welded joints are detailed on the shop drawings.
Base plates meet the foundation
Bolts and grout tie the structure to concrete.
Process flow chart
From order to hand-over
Diamonds are hold points: work stops until the check is signed.
- Shop drawings approvedMarks and piece listsHold point
- Steel receivedSections checked to BOM
- Cut and drillMarked pieces
- Fit-up and weldTo drawing
- Dimension checkBefore paintHold point
- Blast and paintSurface preparation
- DispatchBy erection sequence
- ErectionPlumb and level
- Final surveyAlignment and bolt torqueHold point
3D model
The steel frame, in 3D
Drag to turn it. Labels name the parts we make, fit and test.
ER diagram
How every record connects
One enquiry links through to its quotation, order, jobs, inspections and dispatch, so nothing gets lost between teams.
Quality assurance plan
What gets checked
A typical plan, agreed with you for each job.
| Stage | Check | Method | Record | Role |
|---|---|---|---|---|
Incoming steel | Section, grade | Test certificate review | Material register | R |
Fit-up | Dimensions, squareness | Tape and square | Dimension report | W |
Welds | Size and appearance | Visual, DPT where asked | Weld inspection report | W |
Paint | Surface and thickness | DFT gauge | Paint report | R |
Erection | Plumb, level, high tension bolts | Survey and torque wrench | Alignment report | H |
H: hold point, work stops until signed. W: witnessed. R: record reviewed.
Parts and rates
Parts and indicative rates
Indicative market rates. Your written quotation sets the final price.
| Part or service | Specification | Indicative rate |
|---|---|---|
Structure, supply + fabrication + erection | Standard sections | ₹85 to ₹130 per kg |
Fabrication and erection, labour only | Your steel, our crew | ₹18 to ₹25 per kg |
Custom MS fabrication | By complexity and quantity | ₹70 to ₹180 per kg |
Platforms and gratings | Walkways and handrails | On quotation |
Stairs and ladders | To drawing | On quotation |
Bulk orders
A 45% advance confirms your order
- Purchase orderSend your PO with the 45% advance.
- Slot confirmedProduction and the delivery date are fixed.
- Balance and dispatchThe balance follows your quotation's terms.
Rates are before GST and freight. Only your written quotation fixes the price.
Documents
What you receive
Documents on a typical job. Statutory approvals depend on the job and are agreed in the quotation.
- Shop drawingsDrawing
- Piece list and BOMList
- Material test certificatesCertificate
- Dimension reportsReport
- Paint reportReport
- Erection alignment reportReport